GALLABER PARK CLUBHOUSE: STYLISH MIXED MATERIAL HOLIDAY PARK CLUBHOUSE
A popular holiday park near Hellifield, Gallaber Park required a new clubhouse with a lounge and bar area and a gym for its visitors. We constructed a 2,475 sqft stone building with a slate roof, larch wood cladding, oak screens and frames and a large terrace area was added to the outside. The stylish architectural design of the interior required us to make the wooden and steel trusses on site due to their size and fragility to transport.
Architect: John Wharton Architects
Ilkley Rugby Club: iconic new leisure facility
Funded predominantly by the club and the local community, Ilkley Rugby Club’s new home has an iconic design that echoes the spectacular hill-scape around it. With multi-use sports and social facilities, the clubhouse is built on a suspended floor to raise it above the floodplain. The new facility is very popular and the club’s profile has never been higher. Architect: Design Studio North
This multi-purpose sports hall was a design and build project, and our fourth construction project for this prestigious private school. Sutcliffe demolished the existing building and the site levelled before foundations were piled and construction started. Inside is a fully-equipped modern sports hall designed for multiple uses as well as team sports. The partly-stone clad building blends with the environment and is a fabulous showpiece that has a unique feature – its under-floor heating is fed by heat exchangers from a local water source. Architect: Squires and Brown
WESTVILLE HOUSE: MULTI-PURPOSE HALL FOR SPORTS AND EVENTS
This multi-purpose hall was our first project for Westville House School and the start of a long-term development plan by this private preparatory school. Built over nine months, the 6,826 sqft (635 sqm) hall was subject to planning controls to ensure that it blended into the school’s garden and adjacent woodland in Ilkley. Timber cladding was used to achieve this with great effect. Located at the rear of this busy school, a strict work and delivery schedule with traffic control and high levels of health and safety was required throughout the construction to ensure safe access and keep disruption to a minimum for pupils, parents and staff. The hall has tiered seating that is electrically operated for easy storage and assembly, making this a flexible and useable space. Architect: John and Jennifer Wharton.
“We chose Sutcliffe to design and build our 90 m x 30 m high bay assembly and welfare facility complex because it was able to demonstrate that it could provide a turnkey engineered solution within a target cost and build schedule for a high specification manufacturing extension. Sutcliffe successfully managed the engineering and integration of the facility including two wide bay 20 ton cranes and three 2.5 ton wall mounted cantilever cranes. Sutcliffe continues to remain a premier supplier for us for engineered renovation and new construction projects and services within our Cross Hills manufacturing facility.”
Matt Shockey, Operations Director, Cinetic Landis Ltd
Testimonial 3
“From managing director to site workers, Sutcliffe Construction worked as a team to ensure our new office met the highest standards, was finished on time and within budget. Sutcliffe’s friendly but highly professional approach helped guide us through a potentially high-risk project for a relatively small company. We would recommend them without hesitation and look forward to working with them again in the future.”
Tracy Perrin, Finance Director, Lithos Consulting
Testimonial 4
“Having worked with Sutcliffe Construction on a previous project back in 2015, we went back to the company because of its professional project management and high quality build. Despite this project being particularly challenging – due to working around our fully operational workshop throughout the development – Sutcliffe worked with us to ensure the build was completed safely, on time and on budget. I would have no hesitation in recommending Sutcliffe Construction and look forward to working with them again in the future.”
Robert Watson, Managing Director, Peter Watson (Skipton) Ltd
Testimonial 5
“We chose Sutcliffe Construction for our most recent project due to our past experience working with the company. In 2007-8, Sutcliffe built a large warehouse for us here at Heysham. One of the things that stood out from that project was the professionalism employed to execute the project on a busy working site in quite adverse weather conditions. Everything was done in a very clean and organised manner with minimal disruption to our day-to-day business. Sutcliffe consistently keeps to the timelines promised for projects and I wouldn’t hesitate to recommend it.”